Passive fire protection isn’t finished when the work is complete.
Buildings change.
Contractors move on.
People change roles.
The record should still explain what was done, where it was done, and how it was done.
Built to withstand scrutiny.
Compartmentation, across the life of a building.
Passive fire protection is what holds a fire in the space it started in: the compartment walls and floors, the doors in them, and the seals around everything that passes through. Fire doors, fire stopping and compartment construction are all parts of that same line. We install it, check it and inspect it afterwards.
- Installed.
- Inspected.
- Evidenced.
A building that can answer for itself.
When we finish, the building holds a coherent record of its own compartmentation: what is installed, where, to what specification, by whom, checked by whom, and how it should be maintained.
None of that is sold separately. It is what the work leaves behind, captured while the ceiling is still open, because that is the only moment most of it can be captured at all.
Three rows of a real register.
This is what you are handed at the end of a job. One row per element, structured to go straight into the building’s golden thread without anybody having to retype it.
The status is a controlled value, not an opinion. An empty cell means not yet recorded, and never means compliant.
| Asset ref | Level | Core / area | Room / location | Leaf type | Rating | Certification evidence | Outcome | Defects open |
|---|---|---|---|---|---|---|---|---|
| FD-001 | 03 | East core | Flat 301 entrance | FD30S | FD30 | Label to leaf | Pass | 0 |
| FD-002 | 03 | East core | Riser cupboard | FD60S | FD60 | None found | Replace | 1 |
| FD-003 | 04 | West core | Lobby to stair | FD30S | FD30 | Documentary | Remediate | 2 |
Four ways in.
Tell us about the building.
New build, refurbishment, remediation, planned maintenance, inspection, or the information a building has to be able to produce.